Barcode check-in

Open notesEV-02

The organiser scans the ticket at the door; attendance is recorded once.

Project
Events platformEVT
Scenarios
5 scenarios11 steps
Programmer
Samer Al-HalabiBackend developer
Tester
Leen Al-AhmadLead QA tester
Generated
⁦2026-11-16 · 14:20⁩

Made by Claude over MCP

How to generate it is built into the MCP: scenarios, each with pictures of its steps.

Connected by
Samer Al-Halabi
Key
Claude on the work laptoprs4t_live_••••••••••••7c2e
  1. Generated by Claude⁦2026-11-16 · 14:20⁩
  2. Programmer’s passSamer Al-Halabi⁦2026-11-17 · 11:00⁩
  3. Tester’s passLeen Al-Ahmad⁦2026-11-19 · 15:30⁩
  4. Fixes2 notes left

You have 2 notes from the tester waiting for a fix. Mark each one fixed when you’re done.

Found by the programmer
1

on his first pass

Found by the tester
3

missed by the programmer

Fixed
2

4 notes

Open
2

waiting for a fix

Average time to fix
⁦42.5⁩ h

tester notes

01

Scan a valid ticket

Fixed

Goal: The scan records attendance and shows the guest’s name

Step 1Opening the scanner and pointing the camera at the barcode
Step 2A green card with the guest’s name and ticket type

Expected

The scan records attendance and shows the guest’s name

Actual

Matched the expected after fixing 1 note.

Notes1

  • Found by the programmerSamer Al-Halabi⁦2026-11-17 · 10:40⁩

    ⁦A long name was cut on the card⁩ — ⁦it wraps now⁩

    Fixed ⁦2026-11-17 · 10:55⁩
02

Scan the same ticket twice

Open note

Goal: The second scan is refused with the first entry time

Step 1Scanning the ticket a second time
Step 2A red card “Entered at 09:12 through gate 2”

Expected

The second scan is refused with the first entry time

Actual

Not matching yet:

  • ⁦On a weak connection the second scan records a new entry instead of refusing⁩

Notes1

  • Found by the testerBlockerLeen Al-Ahmad⁦2026-11-19 · 15:05⁩

    ⁦On a weak connection the second scan records a new entry instead of refusing⁩

    OpenReminder sent today 09:00
03

A cancelled ticket

Clean

Goal: A cancelled ticket does not get in

Step 1Scanning a ticket its owner cancelled
Step 2“This ticket was cancelled” with the date

Expected

A cancelled ticket does not get in

Actual

Matched the expected, no notes.

Notes

No notes on this scenario.

04

The live attendance list

Fixed

Goal: The list updates with every scan

Step 1Attendance counter: 312 of 450
Step 2Attendees ordered by entry time
Step 3Searching a guest by name

Expected

The list updates with every scan

Actual

Matched the expected after fixing 1 note.

Notes1

  • Found by the testerMajorLeen Al-Ahmad⁦2026-11-19 · 15:18⁩

    ⁦The counter only updates on reload⁩

    Fixed Today · ⁦09:50⁩· after 42.5 hoursReminder sent today 09:00
05

Manual entry by ticket number

Open note

Goal: If the scan fails the organiser types the number

Step 1The ticket number field under the scanner
Step 2Attendance recorded by number

Expected

If the scan fails the organiser types the number

Actual

Not matching yet:

  • ⁦The field accepts Arabic-Indic digits⁩, ⁦then refuses them on save⁩

Notes1

  • Found by the testerMinorLeen Al-Ahmad⁦2026-11-19 · 15:26⁩

    ⁦The field accepts Arabic-Indic digits⁩, ⁦then refuses them on save⁩

    OpenReminder sent today 09:00